SHOP / PRIMER / 100% SOLIDS MOISTURE VAPOR BARRIER PRIMER
SKU RS-MVB · CAT 04 · PRIMER

100% Solids Moisture Vapor Barrier Primer

Foundation layer. Seals out slab moisture before you coat.

SUBSTRATEUP TO 12 LB MVT100% SOLIDS
SOLIDS
100%
CURE
30m work time
WALK ON
COVERAGE
~300 SF/kit
$259.99/ kitFREE SHIPPING OVER $500
PACK SIZE
2 GAL KIT
QUANTITY
KIT
§ 01

Technical
Data

REV 03 · APR 2026
★ TDS PENDING
Request datasheet →

For most homeowners the TDS PDF is the simplest read. The table to the right is the full lab data for contractors and inspectors.

Show full property tableHide full property table
PROPERTY
VALUE
UNIT / METHOD
Solids by volume
100%
Mix ratio
2 : 1
A : B by volume
Work time @ 75°F
30 minutes
MVT tolerance
Up to 12 lb / 1000 SF / 24 hr
RH tolerance
Up to 99% in-slab RH
Recoat window
8–24 hours
Coverage per kit
~300 SF
2 gal kit @ 8 mil
VOC
0 g/L
Shelf life (sealed)
24 months
★ READ UP BEFORE YOU POUR

Related
Knowledge Center

Application guides, prep checklists, and gotcha notes from the field — paired with this product so you know what you're getting into before the kit ships.

PREP · DO THIS FIRST★ START HERE
SURFACE PREP

How to Prep Your Concrete for Epoxy Flooring

The most important step of any floor coating project. Learn how to clean, profile, and test your concrete so your epoxy or polyaspartic actually sticks — and stays.

8 MIN READREAD →
COMPATIBILITY⚠ READ THIS
PRODUCT KNOWLEDGE

Which Floor Coating Solutions Do NOT Mix?

Not every coating can go on top of every other coating. Urethane over polyaspartic, latex over epoxy, and other combinations that will fail. Know before you pour.

7 MIN READREAD →